QT40-3A widely used concrete block making machine for sale in usa detail
Dongyue Machinery Group is leading block machine manufactuer in China.Our main products are Various automatic and manual concrete block machine,AAC Block machine,ALC block machine,Sand lime block machine and pressure vessel.Our proudcts has been exported to more than 60 countries.
(1) QT40-3A small hollow block making machine Main technical parameters:
Host machine power | 5.2KW |
Moulding cycle | 25S |
Dimension of host machine | 1800×1400×1100mm |
Pallet size | No need pallets |
Weight of the host machine | 0.8T |
Vibration force | 35.5KN |
Mixer model | JD350 |
Voltage | 380V |
General water Consumption | 2T/every day |
Workers | 2 |
Workshop area | 50m2 |
Product | Hollow 400X200X200mm | 4 pcs/mould | 4500/8hours |
Standard 240X115X53mm | 16pcs/mould | 15000/8hours |
Hollow 400X150X200mm | 5 pcs/mould | 6000/8hours |
2) QT40-3A small hollow block making machine operation process
Step1 | The prepared material should be put into the mold box dustpan by the Material car |
Step2 | press the 3 BUTTON and at the same time let the material flat. |
Step3 | press the4 BUTTON on the mold advance to the next mold decoupling above the same time |
Step4 | press the BUTTON 5 when the up-mould at it’s position ,at the same time put the hydraulic control lever forth. At this step ,the down mould will be rise ,it will be make the brick shape successfully. |
Step5 | after the in shape ,the machine will forth automatically and stop the moving automatically ,then make the hydraulic control level back in order to make the down mould drop on the groud |
Step6 | press the BUTTON6 make the up mould on the back ,then put the material by car in cycle. |
3.QT40-3A small hollow block making machine Daily Maintenance
1.Before producing block, test run the machine without material for 2-5 minutes,if the machine
works properly,start to produce with raw material in case that there is obstacles during production.
2.Prohibit to repair machine during production process,must cut the electricity firstly,then check
machine.